The Copenhagen Towers are famous due to the climate conference in 2009. In order to contribute to climate goals, the towers are using an ATES system for the heating and cooling. IF Technology has been involved to perform the design of the ATES system, including the wells in the chalk.

Also, a contribution to the permit request has been done by IF.

 

  • Client: Sjælsøgruppen A/S
  • Location: Copenhagen, Denmark
  • Period: 2009
  • Solution: ATES
  • Services: Engineering, modelling, permits
  • Energy demand: 5.200 MWh heating & 4.400 MWh cooling
  • Max groundwater flow: 600 m³/h
  • Number of Wells: 14
  • Depth: 40 m bsl